Presupuestando con Construplan |
|
|
Autor:
Juan Guillermo Consuegra
|
|
Reporte de Compras ordenado por InsumosEl siguiente es un presupuesto parcial producido con Reportes-Compras-Ordenados por Insumo, en el cual se eliminaron los insumos por valor inferior a $ 30.000. |
|
Codigo
|
Insumo
|
U.M.
|
Cantidad
|
Vr.Unitario
|
Vr.Total
|
|
323
|
CONCRETO CORR. 2500 PSI
|
M3
|
96.25
|
148,132.00
|
14,257,868.00
|
|
5,995
|
MANO
DE OBRA AA
|
HC
|
1,391.55
|
6,426.00
|
8,942,069.00
|
|
5,788
|
PROYECTOR
PISO RRA 400 W
|
UN
|
9.00
|
338,140.00
|
3,043,260.00
|
|
2,643
|
LADRILLO
PRENSADO SANTAFE
|
UN
|
16,473.98
|
179.00
|
2,948,842.00
|
|
5,920
|
RECEBO
COMUN
|
M3
|
219.58
|
11,000.00
|
2,415,400.00
|
|
324
|
CONCRETO
CORR. 3000 PSI
|
M3
|
13.84
|
154,280.00
|
2,135,544.00
|
|
1
|
PUERTA
EN LAMINA
|
UN
|
1.00
|
1,239,980.00
|
1,239,980.00
|
|
1,290
|
CEMENTO
GRIS
|
KG
|
4,791.30
|
180.00
|
862,434.00
|
|
5,988
|
HR.CUADRILLA
Of+Ay ELECT
|
HC
|
79.12
|
7,069.00
|
559,305.00
|
|
5,040
|
ACERO
FIG.60000 PSI 1/2"
|
KG
|
619.50
|
674.00
|
417,543.00
|
|
427
|
VOLQUETA
3 M3
|
VJ
|
8.12
|
36,000.00
|
292,241.00
|
|
3,035
|
TUBO
DE GRES 4"
|
UN
|
67.80
|
3,879.00
|
263,015.00
|
|
4,686
|
TUBO
CONDUIT GRIS 1"
|
ML
|
92.34
|
2,568.00
|
237,129.00
|
|
2,007
|
AYUDANTE
ALB. 2-HORA
|
HH
|
86.56
|
2,632.00
|
227,821.00
|
|
3
|
SUB-CONTRATO
ELECTRICO
|
%
|
1.00
|
201,976.00
|
201,976.00
|
|
3,408
|
VIBROCOMPACT.DIESEL/GAS.
|
DD
|
6.44
|
25,566.00
|
164,665.00
|
|
3,435
|
CABLE
COBRE THW 10 AWG
|
ML
|
274.59
|
560.00
|
153,770.00
|
|
4,013
|
TUBO
DE GRES 6"
|
UN
|
22.29
|
6,487.00
|
144,590.00
|
|
1,601
|
T.CHAPA-ORDINARIO
0.10
|
ML
|
410.61
|
350.00
|
143,712.00
|
|
1,583
|
T.BURRA-ORDINARIO
0.30
|
ML
|
77.80
|
1,400.00
|
108,927.00
|
|
5,876
|
TABLERO
C/LLAVE 12 CIRC
|
UN
|
1.00
|
86,530.00
|
86,530.00
|
|
2,273
|
LADRILLO
TOLETE RECOCIDO
|
UN
|
246.00
|
279.00
|
68,634.00
|
|
5,986
|
AYUDANTE
ELECTRICO -HORA
|
HH
|
18.00
|
2,895.00
|
52,110.00
|
|
1,575
|
REPISA
- ORDINARIO 3 m
|
ML
|
72.07
|
700.00
|
50,446.00
|
|
1,808
|
PUNTILLA
C/CABEZA 2"
|
LB
|
597.00
|
35,393.00
|
35,393.00
|
|
Reporte de Compras por ProveedorEl siguiente es un reporte parcial producido con Reportes-Compras-Resumido por Proveedor, en el cual se eliminaron algunos proveedores para mayor claridad.
|
|
Codigo
|
Insumo
|
U.M.
|
Cantidad
|
Vr.Unitario
|
Vr.Total
|
|
AGUA
POTABLE
|
|||||
|
428
|
AGUA
DE CARROTANQUE
|
LT
|
2,166.40
|
8.00
|
17,331.00
|
|
Total
Agua Potable
|
17,331.00
|
||||
|
5917
|
ARENA
DE PEÑA
|
M3
|
0.93
|
12,000.00
|
11,216.00
|
|
5918
|
ARENA
LAVADA DE PEÑA
|
M3
|
0.30
|
12,000.00
|
3,600.00
|
|
5915
|
GRAVILLA
DE RIO
|
M3
|
0.24
|
29,000.00
|
6,960.00
|
|
5920
|
RECEBO
COMUN
|
M3
|
219.58
|
11,000.00
|
2,415,400.00
|
|
427
|
VOLQUETA
3 M3
|
VJ
|
8.12
|
36,000.00
|
292,241.00
|
|
Total
Alvaro Vargas
|
2,729,417.00
|
||||
|
|
CEMENTO
PAZ DE RIO
|
||||
|
1290
|
CEMENTO
GRIS
|
KG
|
4,791.30
|
180.00
|
862,434.00
|
|
Total
CementoPaz de Rio
|
862,434.00
|
||||
|
CENTRAL
DE MEZCLAS
|
|||||
|
323
|
CONCRETO
CORR. 2500 PSI
|
M3
|
96.25
|
133,318.80
|
12,832,081.00
|
|
324
|
CONCRETO
CORR. 3000 PSI
|
M3
|
13.84
|
138,852.00
|
1,921,989.00
|
|
Total
Central de Mezclas
|
14,754,070.00
|
||||
|
COMGRES
|
|||||
|
6001
|
ACCESORIO
GRES 4"
|
UN
|
6.00
|
3,240.00
|
19,440.00
|
|
Total
Comgres
|
19,440.00
|
||||
|
DIAZ
PEDRO
|
|||||
|
2007
|
AYUDANTE
ALB. 2-HORA
|
HH
|
86.56
|
2,632.00
|
227,821.00
|
|
5986
|
AYUDANTE
ELECTRICO -HORA
|
HH
|
18.00
|
2,895.00
|
52,110.00
|
|
5988
|
HR.CUADRILLA
Of+Ay ELECT
|
HC
|
79.12
|
7,069.00
|
559,305.00
|
|
5995
|
MANO DE OBRA AA
|
HC
|
1,391.55
|
6,426.00
|
8,942,069.00
|
|
5996
|
MANO
DE OBRA BB
|
HC
|
4.11
|
7,069.00
|
29,054.00
|
|
Total
Diaz Pedro
|
9,810,359.00
|
||||
|
En los Reportes de Compras puede verse que el material más costoso es el Concreto de 2.500 PSI. suministrado por Central de Mezclas, por lo cual Usted negocia con el proveedor y obtiene un descuento del 10% que incluye en el presupuesto utilizando la opción Presupuesto-Definiciones y seleccionando el multiplicador por Proveedor en la lengüeta Modificadores:
Luegose activa Presupuesto-Multiplicador Múltiple , localiza allí el proveedor "Central de Mezclas" y digita el valor 0.9 frente a su nombre para que el programa descuente el 10 % a sus insumos cuando se procese esta obra (en la Base de Datos los precios permanecen inalterados).
Usted averigua también que el valor real de los Proyectores de Piso de 400 W es un 15% menos de lo que aparece en la Base de Datos, por lo cual decide corregirlo usando la opción Base de Datos-Insumos Corrientes donde se digita el nuevo valor, que afectará a todos los análisis y obras que lo contengan, y finalmente vuelve a imprimir el Presupuesto Resumido para ver los cambios.
|