| 1 CIMIENTOS Y CONCRETOS | ||||
| 1.1 EXCAVACION MANUAL |
M3
|
10.49
|
19,103.00
|
200,390.00
|
| 1.2 BASE RECEBO |
M3
|
2.69
|
19,726.00
|
53,063.00
|
| 1.3 ZAPATAS |
M3
|
3.50
|
209,840.00
|
734,440.00
|
| 1.4 VIGA AMARRE EN CONCRETO |
M3
|
6.99
|
232,349.00
|
1,624,120.00
|
| 1.5 REFUERZOS HIERRO 60000 FG |
TN
|
0.59
|
932,742.00
|
550,318.00
|
| 1.6 COLUMNAS |
M3
|
2.19
|
280,687.00
|
614,705.00
|
| 1.7 VIGAS AMARRE CONCRETO (confinamiento) |
M3
|
7.60
|
279,802.00
|
2,126,495.00
|
| Total CIMIENTOS Y CONCRETOS |
5,903,531.00
|
|||
| 2 DESAGUES | ||||
| 2.1 EXCAVACION MANUAL |
M3
|
11.45
|
19,103.00
|
218,729.00
|
| 2.2 TUBERIA DE GRES 4" |
ML
|
65.83
|
8,141.00
|
535,922.00
|
| 2.3 TUBERIA DE GRES 6" |
ML
|
21.64
|
11,650.00
|
252,106.00
|
| 2.4 ACCESORIOS DE GRES 4" |
UN
|
6.00
|
7,386.00
|
44,316.00
|
| 2.5 CAJAS INSPECCION 40 x 40 |
UN
|
6.00
|
61,667.00
|
370,002.00
|
| Total DESAGUES |
1,421,075.00
|
|||
| 3 MAMPOSTERIA Y PISOS | ||||
| 3.1 MURO PRENSADO S.FE 0.12 |
M2
|
279.22
|
21,155.00
|
5,906,899.00
|
| 3.2 RELLENOS RECEBO |
M3
|
161.02
|
21,225.00
|
3,417,650.00
|
| 3.3 PLACA BASE CONCRETO 0.10 |
M2
|
805.11
|
19,112.00
|
15,387,262.00
|
| Total MAMPOSTERIA Y PISOS |
24,711,811.00
|
|||
| 4 INSTALACIONES Y CARPINTERIA | ||||
| 4.1 TABLERO PARCIALES 12 CIRC |
UN
|
1.00
|
199,846.00
|
199,846.00
|
| 4.2 PUERTAS LAMINA |
M2
|
17.50
|
70,856.00
|
1,239,980.00
|
| 4.3 REFLECTOR DE PISO 400 W |
UN
|
9.00
|
293,209.00
|
2,638,881.00
|
| 4.4 TUBERIA CN 1" INCRUST |
Ml
|
92.34
|
6,184.00
|
571,031.00
|
| 4.5 CABLE Cu No. 10 AWG |
ML
|
274.59
|
1,943.00
|
533,528.00
|
| Total INSTALACIONES Y CARPINTERIA |
5,183,266.00
|
|||
| 5 GASTOS GENERALES - PERSONAL | ||||
| 5.1 RESIDENTE DE OBRA |
SM
|
7.00
|
423,643.00
|
2,965,501.00
|
| 5.2 CELADOR - ALMACENISTA |
SM
|
10.00
|
150,272.00
|
1,502,720.00
|
| 5.3 INSPECTOR |
SM
|
10.00
|
287,675.00
|
2,876,750.00
|
| Total GASTOS GENERALES - PERSONAL |
7,344,971.00
|
|||
| 6 GASTOS GENERALES - INSTALACIONES | ||||
| 6.1 CAMPAMENTO 9 M2 |
UN
|
0.70
|
340,936.00
|
238,655.00
|
| 6.2 LETRINA 2.00x1.00 |
UN
|
1.00
|
424,200.00
|
424,200.00
|
| Total GASTOS GENERALES - INSTALACIONES |
662,855.00
|
|||
| 7 GASTOS GENERALES - EQUIPOS | ||||
| 7.1 BARRAS |
UN
|
2.00
|
22,000.00
|
44,000.00
|
| 7.2 CANECA 55 GL |
UN
|
2.00
|
12,000.00
|
24,000.00
|
| 7.3 BATEAS |
UN
|
2.00
|
7,900.00
|
15,800.00
|
| 7.4 BALDES 5 GL |
UN
|
2.00
|
1,100.00
|
2,200.00
|
| 7.5 CARRETILLAS |
UN
|
1.00
|
24,990.00
|
24,990.00
|
| 7.6 ANDAMIO TUBULAR SECCION |
SM
|
16.00
|
812.00
|
12,992.00
|
| 7.7 PLANCHON PARA ANDAMIO |
ML
|
12.00
|
1,400.00
|
16,800.00
|
| 7.8 TABLA PARA ANDAMIO |
ML
|
12.00
|
1,900.00
|
22,800.00
|
| Total GASTOS GENERALES - EQUIPOS |
163,582.00
|
|||
| 8 GASTOS GENERALES - VARIOS | ||||
| 8.1 MOBILIARIO OFICINA |
UN
|
1.00
|
30,000.00
|
30,000.00
|
| 8.2 CONSUMOS DE OFICINA |
UN
|
1.00
|
2,000.00
|
20,000.00
|
| Total GASTOS GENERALES - VARIOS |
50,000.00
|
|||
| TOTAL OBRA |
45,441,091.00
|
|||
| 9. IMPREVISTOS Y UTILIDADES | ||||
| 9.1 IMPREVISTOS |
UN
|
1.00
|
744,934.00
|
|
| 9.2 UTILIDADES |
UN
|
1.00
|
3,721,968.00
|
|
| Total IMPREVISTOS Y UTILIDADES |
4,466,362.00
|
|||
| TOTAL OBRA |
49,907,453.00
|
|||